Projects

Neelum Jhelum Hydro Electric Project (12 MW)

Complete civil work of whole power house. Installation of 3* 9L32 Wartsila Engines.
Tanks manufacturing capacity 500 Cubic meter to 20 Cubic meters.HV System
Cable Transmission and Cable Fittings, LV System.

Lotte Engineering & Construction IPP 3 Jordan (600 MW)

FEC supplied 20 sets of steam heating system for HFO un-loading station to Lotte
Engineering & Construction Korea at IPP3 in Jordan having capacity 600 MW

LIBERTY POWER TECH (200MW)

Complete civil work of whole power house. Tanks manufacturing capacity 10,000 Cubic meter to 20 Cubic meters.
Pipe lines for H FO, LFO, LO, Cooling water,Compressed Air System. Steel structure Panel walls for Engine Hall,
Fuel Treatment House. HV System, Cable Transmission and Cable Fittings ,Generator Cable Set. LV System.

LIBERTY POWER TECH CIVIL CONSTRUCTIONCIVIL CONSTRUCTION(200MW)

Building required for power House, utility block separator room, switch gear room and workshop.
The building include Engineering and design, RCC frame work, Bricks masonry walls with plaster.
All sanitation works. Air conditioning for control and switch gear room, windows and doors.
All Civil foundation for Storage Area Tanks and Day Tank Area.Excavation Drain System

NISHAT CHUNIAN POWER LTD CIVIL CONSTRUCTION(200MW)

Building required for power House, utility block separator room, switch gear
room and workshop. The building include Engineering and design,RCC frame work,
Bricks masonry walls with plaster. All sanitation works. Air conditioning for
control and switch gear room, windows and doors. All Civil foundation for
Storage Area Tanks and Day Tank Area.

GULSHAN POWER

Power Plant erection including Tanks design and manufacturing.

NASTLE SHEIKHUPURA

Wartsila 32 DF power project piping auxiliaries platforms and cable trays.

NASTLE KABIRWALA

Manufacturing of power plant total tanks, pipe racks and fitter platforms.

SITARA CHEMICALS (PER OXI DE)

Hydrogen peroxide storage tank (S.S 304L) Structure, Piping & Insulation, sandblasting
and painting.

PRIME CHEMICALS

Manufacturing of H25O4 tanks and Modification in pipe line.
GULSHAN WEAVING MILLS LTD.

Erection of new cooling tower, air compressor, structure, Piping and miscellaneous works.

DG CEMENT II

Supply of engine platform raw material and engine platform Grating at Kalar Kohar

ATTOCK GENERATION LTD

Manufacturing of total storage tanks
SAPPHIRE GROUP

New loom shed, Piping & Insulation, Steel Structure (Sheds)

NISHAT POWER LTD (200MW)

Complete civil work of whole power house. Tanks manufacturing capacity 10,000 Cubic meter to 20 Cubic meters.
Pipe lines for H FO, LFO, LO, Cooling water, Compressed Air System. Steel structure Panel walls
for Engine Hall, Fuel Treatment House. HV System, Cable Transmission and Cable Fittings,
Generator Cable Set.LVSystem.